Pressure equipment

PED pressure vessels, piping modules and skids

First In Service manufactures pressure vessels, tanks, piping modules and skids to EN 13445-4 and EN 13480-4 under the Pressure Equipment Directive 2014/68/EU. Equipment above the Article 4 category thresholds is built in carbon steel, stainless steel, duplex and super duplex under notified-body surveillance, with full traceability.

Key takeaways

  • Products: pressure vessels, tanks, piping modules and skids for process and offshore scope.
  • Standards: EN 13445-4 and EN 13480-4 under the Pressure Equipment Directive 2014/68/EU.
  • Approval: welding manufacturer approval under PED Annex I 3.1, PEDWQMS154/2026, issued by TÜV Eesti.
  • Materials and inspection: carbon steel, stainless, duplex and super duplex; NDT by VT, PT, MT, UT and RT; EN 10204 3.1 certificates, 3.2 on request.
Overview

Pressure equipment to PED, built to contain what cannot leak.

We manufacture certified pressure vessels, tanks, piping modules and skids for oil & gas, process and offshore applications. We work in strict compliance with PED 2014/68/EU and international safety standards.

Products

Pressure vessels: To PED 2014/68/EU
Tanks and skids: Process and offshore scope
Piping modules: Fabricated and pressure-tested

Materials

Steels: Carbon steel, stainless steel
Corrosion-resistant: Duplex, super duplex

Compliance & inspection

Directive: PED 2014/68/EU
NDT: VT, PT, MT, UT, RT via certified partners
Documentation: EN 10204 3.1, 3.2 on request
Specifications

Specifications at a glance

Pressure equipment manufacturing specifications — First In Service OÜ, Tallinn, Estonia
Pressure vesselsTo PED 2014/68/EU
Tanks and skidsProcess and offshore scope
Piping modulesFabricated and pressure-tested
SteelsCarbon steel, stainless steel
Corrosion-resistantDuplex, super duplex
DirectivePED 2014/68/EU
NDTVT, PT, MT, UT, RT via certified partners
DocumentationEN 10204 3.1, 3.2 on request
FAQ

Questions procurement teams ask

Can you build PED-compliant pressure vessels and piping modules?

Yes. First In Service builds pressure vessels, tanks, piping modules and skids under the Pressure Equipment Directive 2014/68/EU. It holds a welding manufacturer approval under Annex I, point 3.1, from TÜV Eesti OÜ (certificate PEDWQMS154/2026). The approval covers pressure vessels to EN 13445-4 and piping to EN 13480-4, in carbon steel, stainless steel, duplex and super duplex. Deliveries come with NDT reports and EN 10204 3.1 material certificates.

Are you PED certified?

Yes. First In Service holds a welding manufacturer approval under PED 2014/68/EU, Annex I, point 3.1, from TÜV Eesti OÜ (certificate PEDWQMS154/2026). The approval covers pressure vessels to EN 13445-4 and piping to EN 13480-4. Pressure equipment is manufactured to PED 2014/68/EU, with fully compliant documentation.

What pressure equipment do you manufacture?

Pressure vessels, tanks, piping modules and skids for process, oil & gas, and offshore applications.

What materials are used for pressure equipment?

Carbon steel, stainless steel, duplex, and super duplex, selected to the service conditions and PED category.

What NDT is performed on pressure equipment?

VT, PT, MT, UT, RT, and UT to the scope required by the PED category and client specification, performed by certified partners.

What documentation ships with pressure equipment?

PED conformity documentation, material certificates (EN 10204 3.1, 3.2 on request), and NDT reports.

Can you handle hydrogen and carbon capture equipment?

Yes. Pressure equipment to PED 2014/68/EU in duplex, super duplex and stainless steel is the same discipline used for hydrogen storage and CCUS process equipment.

Process

PED compliance as a production method, not a paperwork sprint

Pressure equipment manufacturing is regulated for a reason: when it fails, stored energy is released. PED 2014/68/EU compliance therefore cannot be pieced together afterwards from whatever records survive production; it has to be designed into the build. We classify the equipment category at the quoting stage and agree the conformity assessment route. Production is structured so every hold point generates its record as it happens. Heat numbers are verified at material receipt, weld procedures and welder qualifications are matched to each joint, and NDT scope is executed per category requirements.

Duplex and super duplex demand particular discipline: heat input control during welding, verified ferrite balance, and pickling that restores the passive layer. These are process parameters we control and log. We do this because a stainless vessel that corrodes in service is a materials failure that started in the workshop.

Production closes with a hydraulic or pneumatic pressure test to specification, witnessed where required. The vessel ships with its complete PED documentation package, ready for conformity declaration and commissioning, with no missing certificate to hold up your schedule.

Industries we serve

Where this capability goes to work.

Oil & gas

Vessels, columns, piping modules and skids to PED category.

Oil & gas →

Marine, offshore & subsea

Pressure systems for marine and offshore installations.

Marine, offshore & subsea →

More industries

Defence, energy, mining, pulp & paper. See delivered work by sector.

References →
More industries we serve

The same facility, with the evidence each sector asks for.

Rotating parts & shafts

Impellers, casings, rotors, shafts and turbine housings to ±0.02 mm.

Rotating parts & shafts →

Defence

Manufactured in an EU and NATO member state, with full heat-number traceability.

Defence →

Mining & machine building

Crusher frames, conveyor structures and wear-resistant steel assemblies.

Mining & machine building →

Pulp & paper

Rolls, processing components, PED vessels and shutdown-critical spares.

Pulp & paper →
Emerging scope

Hydrogen and carbon capture use the same discipline.

Pressure equipment to PED in duplex and super duplex is the core competence behind hydrogen storage vessels and CCUS process equipment. The materials, weld procedure control, ferrite balance verification and documentation package are the same ones we work with every day. If your project is in this space, the capability is already here: talk to us about scope before you assume it needs a specialist.

Verifiable

What the PED certificate covers

Transcribed from the certificates themselves, so every claim below can be checked against the issuing body.

Scope: Pressure vessels (EN 13445), Pipings (EN 13480). Verified according to Directive 2014/68/EU, Annex I, point 3.1 and EN ISO 3834-2.

TÜV Eesti OÜ — Certificate
Certificate no. PEDWQMS154/2026 · valid until 24 October 2029 · issuing body

Primary sources: PED 2014/68/EU · EN ISO 3834-2 · EN 10204

Sources for the figures on this page: capacities and dimensions come from the First In Service machine list, as of November 2026. Welding and fabrication are certified by TÜV Eesti OÜ: EN 1090-2 up to EXC3 (certificate 1526-CPR-1090-1.0173.TÜVEESTI.2026.000) and EN ISO 3834-2 (certificate WQMS154/2026), both issued in 2026. All certificates are on the certificates page. Background reading: Pressure Equipment Directive on Wikipedia.

Limits: the sizes and weights stated here are maximums. However, whether a specific part fits depends on its shape, weight and material, so send the drawing and we will confirm it before we quote.

Ready to discuss your project?

Send your drawings and specifications. We reply within 1 working day and send a firm quote within five working days.

Request a quoteBook a 20-minute call →Download capability overview (PDF)

Published by First In Service OÜ, Tallinn · · Reviewed by Madis Kollo (MSc in Engineering, MBA), Head of Sales & Business Development

In brief

160 tonnes. 35 metres. 20 km to the ship. Heavy fabrication, precision machining and mechanical assembly under a single contract. One supplier is responsible for the finished geometry and for the documentation that proves it.

At a glance