ONS 2026 · Stavanger · 24–27 August

First In Service at ONS 2026

First In Service exhibited at ONS 2026 in Stavanger, Norway, from 24 to 27 August 2026 at the Estonian Pavilion, showing heavy fabrication to 160 tonnes, CNC machining to ±0.02 mm and in-house NORSOK M-501 coating. Send drawings to the Tallinn team and an engineer replies within one working day.

Book a follow-up call →
Where and when

Four days on the stand, with two engineers who quote.

Venue: Stavanger Forum, Gunnar Warebergsgate 13, 4021 Stavanger, Norway
Stand: Estonian Pavilion, Hall 5, Stand 5320
Dates: Monday 24 – Thursday 27 August 2026
Hours: Mon–Wed 09:30–17:30, Thu 09:30–15:00
Madis Kollo (Head of Sales & Business Development): all four days
Hanno Saar (Managing Director): 25–26 August
Why walk to Hall 5

160 tonnes. 35 metres. 20 km to the ship.

First In Service is a single-site precision manufacturer in Tallinn: heavy fabrication up to 35 × 7 × 7 m and 160 tonnes, CNC machining to ±0.02 mm, and FAT-tested assembly under one roof, one contract and one quality system (EN ISO 3834-2, EN 1090-2, PED 2014/68/EU). NORSOK M-501 and C5-M surface treatment is applied in-house, with film thickness logged per layer.

For Norwegian and Nordic operators, the logistics claim is checkable: our facility is 20 km from Muuga Harbour, with direct heavy-haul road access, no urban transport restrictions and ro-ro capability for oversized components, and everything we ship is of EU origin. One audit in Tallinn covers the entire production chain, because everything happens in one building.

Find us

Where we were.

ONS 2026 First In Service OÜ ESTONIAN PAVILION HALL 5 · STAND 5320 Stavanger Forum, Norway 24–27 August 2026 Mon–Wed 09:30–17:30 · Thu 09:30–15:00 firstinservice.ee

The card above shows where we were at the fair: Stavanger Forum, Gunnar Warebergsgate 13, 4021 Stavanger.

What happens at the stand

Bring a drawing. Leave with a real answer.

It was not a brochure stand. Both people on it quote work for a living, so a twenty-minute conversation could settle questions that normally take a month of emails.

Feasibility: show us the component on paper, on your phone or as a description, and we will tell you straight whether it fits our envelope and where the difficulties lie
Lead time: an indicative window based on current shop load
Documentation: what an EN 10204 3.1/3.2 package, NDT scope, or PED conformity route looks like for your specific scope
Coating: whether NORSOK M-501 or C5-M is the right specification for your service environment, and what it changes in cost and schedule
Next step: if it fits, drawings go to our engineers the same week, with a firm quote within 5 working days

No appointment needed. Walk-ups were welcome on all four days; a booked slot simply guaranteed that we were at the stand and free. Mornings before 11:00 were usually the quietest.

Come prepared

Pre-reading, if your scope is offshore.

How to evaluate an offshore fabrication supplier

The checkable facts experienced buyers verify before awarding fabrication work: certifications, NDT independence, documentation and logistics.

Read the guide →

NORSOK M-501, explained for buyers

What the Norwegian offshore coating standard actually requires, how it differs from C5-M, and five questions that expose real coating discipline.

Read the guide →

Missed us in Stavanger? Twenty minutes can still shortcut six months of supplier search.

At the fair you could meet Madis on all four days and Hanno on 25–26 August. Book a call now, bring a drawing and get a view on feasibility and lead time.

Book a follow-up call →Download capability overview (PDF)
FAQ

Questions buyers ask

Where was First In Service at ONS 2026?

At the Estonian Pavilion: Hall 5, Stand 5320, Stavanger Forum, 24–27 August 2026. The stand was open Monday to Wednesday 09:30–17:30 and Thursday 09:30–15:00.

Did I need an appointment to visit the stand?

No. Walk-ups were welcome on all four days, but a booked 20-minute slot guaranteed time with Madis Kollo, and on 25–26 August also with Managing Director Hanno Saar. Booking took one minute through the link on this page.

What projects were worth discussing?

Heavy fabrication up to 35 × 7 × 7 m and 160 tonnes, CNC machining to ±0.02 mm, FAT-tested assemblies and PED pressure equipment, especially scopes needing NORSOK M-501 surface treatment or single-site accountability. A drawing on your phone is enough to start a real conversation.

Will First In Service sign an NDA before reviewing drawings?

Of course. Mention it in your booking note, and an NDA will be in place before any technical material changes hands.

In brief

160 tonnes. 35 metres. 20 km to the ship. Heavy fabrication, precision machining and mechanical assembly under a single contract. One supplier is responsible for the finished geometry and for the documentation that proves it.

At a glance